A safety net on a low building and a safety net on a high-rise are not the same purchase, even when the mesh looks identical. On a high-rise the edge moves up floor by floor, the wind grows with height, and what falls does not land on an empty site — it lands on a pavement, a road, or the floor below. The net at the perimeter has to do three jobs at once: catch a falling person, stop falling debris, and stay attached while the wind tries to peel it off the building. Specify it for all three, or it will fail at the one you forgot.


  1. Two nets at the edge — a vertical one and a horizontal one


The perimeter of a high-rise usually carries two different nets, and confusing them is the first mistake. A vertical net (EN 1263-1 systems U and V) hangs at the slab edge to stop people and objects going over it. A horizontal catch net (systems S and T, or a fan platform) sticks out from the edge below the work to catch what falls. The vertical net is the barrier; the horizontal net is the catch. A job that orders only the vertical net has no catch for the worker who goes over the edge, and a job that orders only the horizontal net has nothing stopping debris from sailing past it on the wind. Ask which system is quoted, and for which of the two jobs — the label guide explains how to read systems S, T, U and V, and the combined-systems guide explains how the two layers work together.

  1. Catch width grows with fall height

A net cannot catch a fall it cannot reach. EN 1263-2 sets the fall height, the catching width and the fixing-point loads together: the maximum fall height is 6 metres, and only 3 metres within 2 metres of the edge — and the wider the fall, the wider the net must reach out to catch it. On a high-rise this matters because the work face is rarely a neat horizontal floor: formwork, rebar and the next slab up all change where a person can fall from and how far out the net must extend. Ask for the catching width for this fall height, at this span, and check it against the edge as it actually is — not against an empty drawing. The installation guide covers fall height and fixing points in full.

  1. Wind is a load, not weather

A full wrap of netting on a high-rise is a sail. The higher the net, the stronger the wind it meets, and the load goes into the scaffold, the fixings and the structure behind them — not just into the net. That is why a perimeter net is a design question before it is a purchase: the scaffold designer must have accounted for the netting before it goes up, and the fixings must be checked for the load the wind will put on them. A fine debris liner that stops dust also catches more wind than a coarse fall net, so the liner decision and the wind decision are the same decision. The bridge guide covers the same problem on a wide net under a bridge deck; on a tower, the same rule applies floor by floor.

  1. What falls from a high-rise, and who is underneath

From a low roof, a dropped tool lands on the site. From the twentieth floor, it lands on a street. That changes the mesh answer: overhead protection where people pass underneath is commonly lined at about 19 mm (¾ inch) so falling tools are stopped, and a coarse personnel net on its own will not stop nails, screws and paint chips. Ask what the mesh stops — a falling person, falling tools, or dust — and whether a liner is sewn in. Then ask what is below the net: traffic, a pavement, a lower floor, the public. Where traffic must keep passing underneath, the net is stretched tight beneath the work area so vehicles can pass without damaging the system. The mesh-size guide gives the full comparison, and the debris-vs-personnel guide explains why one net cannot do both jobs without its liner.

  1. The net moves up — and must be re-checked every time it does

A high-rise net is not installed once. It is installed, moved up a floor, installed again, and moved again, for as long as the structure rises. Every move is a new installation: fixings re-checked, border rope re-tensioned, clearance below re-measured, and the net inspected before work restarts above it. A net that was right on floor ten is not automatically right on floor eleven — the wind is stronger, the fall is longer, and the fixings are in a different slab. The inspection guide explains the weekly checks and the retirement decision; the test mesh, cut out and tested each year, is what says whether the net is still good after all those moves. Visual inspection alone never proves it.

  1. Fixings that hold without damaging the building

On a new concrete frame, brackets and gallows-type supports (systems T and V) can be fixed to the structure as it rises. On a finished or historic facade, drilling into the structure may not be allowed at all — and the fixings must be designed around that, not improvised on the day. Ask how the net is fixed, what the fixings attach to, and whether the anchor points have been checked for the load: under EN 1263-2, anchor points must take not less than 6 kN. A fixing that holds the net on a calm day and pulls out in a gust is not a fixing. The installation guide covers fixing points; the bridge guide covers the no-drilling case.

  1. Flame retardancy, floor by floor

Scaffold and perimeter netting on a high-rise is often required to be flame retardant — to NFPA 701, the standard cities such as New York reference, or to EN 13501-1 on the European route. Hot work happens on every floor of a tower, and a net that carries a flame from one floor to the next is a different risk from a net that carries it nowhere. Ask whether flame retardancy is required for this job or city, and if it is, ask for the certificate with the order — the certificate, not the colour or a stripe in the hem, documents compliance. The flame-retardant guide explains both standards and where FR nets are required.

  1. What to ask before the net goes up

Before ordering a high-rise perimeter system, get these answers in writing: which system (U/V vertical, S/T horizontal, or both), which EN 1263-1 class, what mesh and whether a liner is sewn in, the catching width for the fall height on this job, how the net is fixed and whether the scaffold designer has allowed for the wind load, how many test meshes come with the net and when they must be tested, and the flame-retardancy certificate if one is required. Keep the answers with the net's label, so the person who moves the net up a floor and the person who inspects it in a year's time are reading the same specification you ordered. The buyer's checklist pulls the same ten questions together for any safety-net order; the custom-order guide walks through sizes, mesh, rope and the factors that affect cost — without inventing a price, MOQ or lead time, because those depend on the order itself.

The edge is the job

A high-rise perimeter net fails quietly: a fixing that was never checked for wind, a catch width that was never measured for the real fall height, a liner that was never ordered because nobody asked what falls. None of those shows up until something falls, or until the wind finds the weak fixing. Specify the system, the width and the fixings before the net goes up — and check them again every time the net moves up a floor.